![]() |
Regeneration |
![]() Tel : 01730 827263 |
|
Services Ltd |
Green Waste |
The process.
We will provide to your site a "Roll On Roll Off" container from 15 cubic yards capacity upwards, the green raw material must be placed within the confines of the container
On receipt of the fresh raw material it is placed in one of the bays and is shredded within the first 24 hours. After the first shredding, it is left to 'cook' for a while, depending on rainfall and outside temperatures. The heap temperature is monitored to maintain a constant 65 to 72 degrees centigrade. As soon as the temperature drops below that, the raw compost is passed through the shredder again. This turns the heap and serves to re-activate bacteria whose renewed activity in turn warms up the compost again. This ensures that temperatures are maintained to aid breakdown and that any weed seeds and pathogens are killed off.
|